|
Click
picture to Enlarge >> |
|
|
|
| InternetGhana's
Snr. Procurement Officer, Mr. Eric Annan
inspecting the equipment packed at the
headquarters. |
|
Some
of the equipment packed at the headquarters. |
|
|
|
| Mr.
Eric Annan looking at the structure
of one of the equipment. |
|
Mr.
Hans Odei(left), Snr. Supervisor &
Mr. cruz(right) of Navini sorting out
the cables for installation. |
|
|
|
| Mr.
Eric Annan impressed after examining the
equipment in-house |
|
Mr. cruz gattering the necessary materials
for the installation. |
|
|
|
| Mr.
cruz(left) and Mr. Alfred Gaisie(DCEO)
putting the cables together. |
|
InternetGhana's
Rigger team busily fixing the Navini Wireless
Radio equipment at the very depth of the
mask. |
|
|
|
| Mr.
cruz and InternetGhana's Engineering team
seriously putting the equipment together. |
|
|
|
| Mr.
cruz and InternetGhana's Engineering team
frequency level of the new installation. |
|
|
|
| The
Rigger team doing their work up high the
mask |
|
Mr.
cruz(right) and Mr. Nii Sai of Engineering
department mapping the cables |